Projects

Penmorfa Reception Desk
As part of the new library project within the Penmorfa Council office in Aberaeron, Electrical Estimates worked with CRS Construction LTD to refurbish the main reception desk.

CCC Aberaeron Depot
Electrical Estimates LTD undertake all sizes of commercial work. This storage container required lighting and power which we were able to deliver with high quality PVC conduit and commercial grade LED non-corrosive linear light fittings, installed to our usual high standards.

Aberystwyth University Physics 1.13
Aberystwyth university, Physics building, New Digital system laboratory. This medium sized refurbishment project transformed an aging classroom and store into a modern teaching space and laboratory; As main contractor J&E Woodworks managed several specialised sub-contractors, including Electrical Estimates who under took the electrical, power, lighting and data networking.

Ysgol Bro Teifi Desks
Working on behalf of the Ceredigion County council and Llandysul school, Electrical Estimates assisted in adapting classrooms into computer suites.

Aberystwyth University Llandinam
We have undertaken several classroom refurbishments on behalf of Aberystwyth University over the years.

Holy Trinity Church
In 2024 we carried out an upgrade to the lighting in Holy Trinity Church. Works involved replacing the existing lighting in the nave, the transept and above the high altar.

Vale of Rheidol Museum
Phase 3 of the Vale of Rheidol’s regeneration project involved the refurbishment of the old carriage shed to create a multi-use and museum space.

Aberystwyth Town
We were happy to partner with E J Morgan & Sons on the refurbishment of a property in the town centre of Aberystwyth, consisting of a commercial unit on the ground floor and 2 flats upstairs.

Sports Dome
In early 2024 we worked alongside Afan Construction and Rocklyn Engineering on the installation of an inflatable dome at Aberystwyth University sports centre which will house their state-of-the-art gym.

SEN unit Aberaeron and Reception
We worked under Wynne Construction on the extension of the existing SEN unit at Canolfan y Don and main reception block on the campus of Aberaeron secondary school.